STAB12 - Second UPS


Project
Objective


To reduce network downtime by reducing the scheduled downtime required for preventative maintenance.



Project
Description


An Uninterruptible Power Supply (UPS) protects computers in the computer room against power fluctuations, power surges and brownouts.  Without a well functioning UPS, even sub second interruptions to power can be catastrophic (such as the incident on 22 December 06 that resulted in most systems being unavailable for 5 days.)  The UPS must be maintained once a quarter and this requires ALL systems to be turned off, resulting in a total outage of all computer services for a period of 5 – 6 hours.  The purchase of a second UPS means that one can remain in operation whilst the other is being maintained, eliminating the need for the total system outage.


Key Outputs


  • Second UPS installed, documented and under maintenance contract.

  • Updated “Downtime Schedule” to remove requirements for downtime for UPS maintenance.


Project Schedule


Project will commence in 2008.  Detailed schedule to be decided.


Project
Dependencies


  • None


Project
Responsibility


Project Sponsor      : Mary Sharp, Director IT Services

Senior ITS Manager : Peter Hole, Deputy Director ITS

Project Manager      : Joseph Rizzo, Operations Manager



Relevant Documentation


  • None


Project Status


 

 

As at 30 December 2007

Project has not commenced.

 

 

 

 